Neon drop · Free ship $75+ · Enter the grid
Signal · Product Feed

Control Room Entrance Colour:Raw Snow load has been working

SKU: 23631291370

4.9
USD100.00 USD127.00

Pay in 4 interest-free payments of $25.00 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 5 - Aug 10

Live Spec

Control Room Entrance Colour:Raw Snow load has been workingThe entrance to the Hornsby Quarry control room stands open, its concrete walls and steel frames showing the wear of decades of active quarrying. The structure is part of the remnant crusher plant buildings that survived the quarry's closure in 2002, when CSR Construction Materials ended nearly a century of dolerite extraction on the site. Part of the Hornsby Quarry series.

Store: clickpoint.com.au · Domain: clickpoint.com.au

Description

Snow load has been working on this building for years

rust streaking down its faded plastic in long ochre lines

A steel slab taken mid-cut

The boiler house formed the central and tallest section of Station No

replacing the open hearth furnaces that had operated since 1931

Control Room Entrance Colour:Raw Snow load has been workingThe entrance to the Hornsby Quarry control room stands open, its concrete walls and steel frames showing the wear of decades of active quarrying. The structure is part of the remnant crusher plant buildings that survived the quarry's closure in 2002, when CSR Construction Materials ended nearly a century of dolerite extraction on the site. Part of the Hornsby Quarry series.

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products