Control Desk Type:Unframed The school operated from its
Pay in 4 interest-free payments of $25.00 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 5 - Aug 10
Live Spec
Control Desk Type:Unframed The school operated from itsA heavy industrial control desk, its angled panel crowded with rotary dials and switches, sits abandoned inside Hornsby Quarry. Spray paint layers the surface; graffiti covers the concrete walls and timber boarding behind it. The quarry operated from around 1905 to 2002 under a succession of operators, producing crushed dolerite for road base across northern Sydney. Part of the Hornsby Quarry series.
Store: clickpoint.com.au · Domain: clickpoint.com.au

























